DESIGN AND PROCUREMENT OF TELECOMMUNICATION SYSTEMS FOR AGIP KCO, KASHAGAN

In the middle of 2011 AVENCOM signed a contract with Agip KCO which included providing detailed design, procurement, assembly, start up and adjustment of the following systems:

  • ACS;
  • LAN and telephone lines;
  • Fibre optic telecommunications lines
  • TETRA radio
  • PA/GA

KAZAKHMYS BOZSHAKOL SULPHIDE PROJECT

The Bozshakol Copper Project has been targeted for development to facilitate the long term production and supply of copper concentrate for the Balkash and Zhezkazgan smelters. The Kazakhmys smelters are presently under utilised by thirty percent and the onstream production of Bozshakol in 2014 will result in a significant increase of copper production; adding over 100 000 tonnes per annum into the overall copper cathode production capabilities.


METROETHERNET FOR KAZAKHMYS CORPORATION

Metro  Ethernet network was designed to combine the industrial areas of the metallurgical complex of Corporation Kazakhmys in two cities for the first, to ensure the rapid exchange of current information received from the automation systems and telemetry, and secondly to increase the capacity of the connection
as the Internet and the Intranet.


BUZACHI OPERATING TOWER&WiMAX

Implementation of the project took place in two stages. First stage - Included the construction of a 43 m tower with a telecommunications container and was associated with the design and subsequent examination of the project by the authorized bodies. In the middle of summer, the assembly of the structures began on the site selected for the construction on the field. After two weeks the 43m tower with the telecommunications container were ready for commissioning. After approval by the state commission the object was successfully put into operation. With this the first phase was completed.


WIRELESS TRANSPORT SYSTEM FOR ELECTRONIC GOVERNMENT

Electronic Document Circulation (EDC) system was designed to connect all the departments of the government of West Kazakhstan region into one computer based network. Each department is equipped with a server responsible for collecting, storing and distributing of documents.


TECHNOPARK ALGORITM URALSK

The construction of the new Technopark Algoritm office was included into the RoK 2006 Development Program. It was planned to be a modern office with state-of-the-art equipment and infrastructure. The government ran a tender to reveal the best contractors in the region to implement the President’s plan.


AGIP KCO KASHAGAN 70 METER RADIO TOWER FOR KARABATAN CAMP

There is an AGIP-KCO project for Kashagan Field Development onshore project. The Kashagan field is located in the Caspian Sea offshore Kazakhstan, approximately 80 km south of the town of Atyrau. The reservoir contains 45 API oil
with associated sour gas. The development will comprise a combination of both offshore and onshore processing facilities.