COOLING SYSTEM FOR AGIP KCO TRAING CENTERE SERVER ROOM

In June, 2009, Agip KCO и AVENCOM signed a contract for the «Design, production, delivery, installation, checking and commissioning of an independent cooling system for the server room at the training center of Agip KCO in Atyrau. According to the contract AVENCOM prepared a project, including all the required detailed documentation, which was sufficient for executing the purchase of equipment and materials and the construction work. AVENCOM surveyed the actual condition of the building and its electrical systems in order to identify the best solution for the siting of the external unit of the precision air conditioner and the connection of the cooling equipment to the existing electricity supply system. AVENCOM also carried out all the construction work necessary for a reliable Inert Gas Fire Fighting System in the server room. AVENCOM carried out the design, procurement, assembly and commissioning of the required cooling system. The project includes all the auxiliary systems necessary for a fully functioning operational cooling system. 


KPO BV KARACHAGANAK VIDEOCOFERENCE SYSTEM

Geographically located structure of the KPO b.v. (Aksai, Karachaganak field, Astana, London, parent companies’ offices) requires high-quality videoconferencing connection between offices.


BUZACHI OPERATING TOWER&WiMAX

Implementation of the project took place in two stages. First stage - Included the construction of a 43 m tower with a telecommunications container and was associated with the design and subsequent examination of the project by the authorized bodies. In the middle of summer, the assembly of the structures began on the site selected for the construction on the field. After two weeks the 43m tower with the telecommunications container were ready for commissioning. After approval by the state commission the object was successfully put into operation. With this the first phase was completed.


BANK CENTERCREDIT HVAC

In connection with the construction of a new office for Bank CenterCredit, we were given the task of designing, procuring and installing a turnkey HVAC system. At the end of the design stage, it was proposed that AVENCOM:

  • procure equipment for ventilation and air-conditioning;
  • procure installation materials and refrigeration equipment;
  • procure equipment to control the ventilation and air-conditioning;
  • install copper pipes for the refigeration;
  • commission the equipment for the ventilation and air-conditioning system;

The difficulty in executing a client's assignment in a new building under construction is the need to work together with other contractors harmoniously while fulfilling work to an agreed schedule. AVENCOM successfully managed to do this, thanks to the team working skills and expertise of the design team.


CALL CENTER FOR AKIMAT OF WEST KAZAKHSTAN

This project was designed to solve several tasks ofthe Customer:

  1. Deployment of Call Center with capability to process to 60 simultaneous calls
  2. Corporate network for departments of WKR Government and IP telephony

INTEGRATED SYSTEM FOR PUBLIC SERVICE CENTERS, JUSTICE DEPARTMENT OF WEST KAZAKHSTAN OBLAST

According  to  the  direction  of  the  President  of  RoK  to create  the  network  of  population  service  centers  to provide  execution  of  Electronic  Government  program, and also to develop and implement standards of public services,  Justice  Department  of WKO  declared  a  bid to purchase  equipment  necessary  to  support  reliable functioning of the integrated system


AGIP KCO BAUTINO BASE HVAC SYSTEM

It was necessary to propose HVAC system for two external electrical units on the site of treatment facilities of drilling sludge and reduced crude water on AGIP KCO Base at Bautino village in Mangystau Region of Kazakhstan.