PIPELINE CONDITION MONITORING & SURVEILLANCE SYSTEM EXPANSION OF KAZTRANSOIL ALIBEKMOLA – KENKIYAK – ZHANAZHOL CRUDE OIL PIPELINE

The scope of first phase of the project was commissioned in December 2009 on Oil Pipeline, Kenkyak MOPS – Zhanazhol MOPS section and consisted of one OptaSense interrogator unit, one processing and storage server and two operator workstations.


TENGIZCHEVROIL DATA TRANSMISSION SYSTEM FOR WAREHOUSE BARCODE PROJECT

In the implementation of this project the following problems were solved:

  • provision of a high rate on the radio channels;
  • coverage of the specified area;
  • possibility of simultaneously working with several clients;
  • possibility of filtering traffic and the provision of secure wireless access to controller devices;

PROCESS VISUALISATION SYSTEM FOR NCPOC KASHAGAN

Within the terms of a contract signed in September 2013, AVENCOM took responsibility for providing a complex solution in accord with the assignment, that on handover would include all the housing, installation, wiring and equipment connecting work.


PERSPEKTIVA KAN HVAC

AVENCOM developed a modern system for heating, ventilation and air-conditioning for the new office building for the asphalt plant of LLP “Perspektiva Kan”.
Air-conditioning used the hydronic scheme of a fancoil chiller. The preferred chillers are assembled for specific circumstances, and therefore their power, performance
and framing, are in accord with the preliminary estimates. A mixture of water and diethylene glycol is used for the heat-cold carrier.


DESIGN AND PROCUREMENT OF TELECOMMUNICATION SYSTEMS FOR AGIP KCO, KASHAGAN

In the middle of 2011 AVENCOM signed a contract with Agip KCO which included providing detailed design, procurement, assembly, start up and adjustment of the following systems:

  • ACS;
  • LAN and telephone lines;
  • Fibre optic telecommunications lines
  • TETRA radio
  • PA/GA

KAZAKHMYS BOZSHAKOL SULPHIDE PROJECT

The Bozshakol Copper Project has been targeted for development to facilitate the long term production and supply of copper concentrate for the Balkash and Zhezkazgan smelters. The Kazakhmys smelters are presently under utilised by thirty percent and the onstream production of Bozshakol in 2014 will result in a significant increase of copper production; adding over 100 000 tonnes per annum into the overall copper cathode production capabilities.


AUDIO-VISUAL EQUIPMENT FOR NCPOC “CASPIAN” OFFICE IN ATYRAU

In June 2011, NC Production Operations Company B.V. And AVENCOM signed a contract for the design and installation of a high quality latest generation 3D equipment. The project was intended to fully equip the «Caspian» Business Center with sound and visual equipment..