KAZAKHMYS BOZSHAKOL SULPHIDE PROJECT

The Bozshakol Copper Project has been targeted for development to facilitate the long term production and supply of copper concentrate for the Balkash and Zhezkazgan smelters. The Kazakhmys smelters are presently under utilised by thirty percent and the onstream production of Bozshakol in 2014 will result in a significant increase of copper production; adding over 100 000 tonnes per annum into the overall copper cathode production capabilities.


BUZACHI OPERATING TOWER&WiMAX

Implementation of the project took place in two stages. First stage - Included the construction of a 43 m tower with a telecommunications container and was associated with the design and subsequent examination of the project by the authorized bodies. In the middle of summer, the assembly of the structures began on the site selected for the construction on the field. After two weeks the 43m tower with the telecommunications container were ready for commissioning. After approval by the state commission the object was successfully put into operation. With this the first phase was completed.


CALL CENTER FOR AKIMAT OF WEST KAZAKHSTAN

This project was designed to solve several tasks ofthe Customer:

  1. Deployment of Call Center with capability to process to 60 simultaneous calls
  2. Corporate network for departments of WKR Government and IP telephony

INTEGRATED SYSTEM FOR PUBLIC SERVICE CENTERS, JUSTICE DEPARTMENT OF WEST KAZAKHSTAN OBLAST

According  to  the  direction  of  the  President  of  RoK  to create  the  network  of  population  service  centers  to provide  execution  of  Electronic  Government  program, and also to develop and implement standards of public services,  Justice  Department  of WKO  declared  a  bid to purchase  equipment  necessary  to  support  reliable functioning of the integrated system


WIRELESS TRANSPORT SYSTEM FOR ELECTRONIC GOVERNMENT

Electronic Document Circulation (EDC) system was designed to connect all the departments of the government of West Kazakhstan region into one computer based network. Each department is equipped with a server responsible for collecting, storing and distributing of documents.


TECHNOPARK ALGORITM URALSK

The construction of the new Technopark Algoritm office was included into the RoK 2006 Development Program. It was planned to be a modern office with state-of-the-art equipment and infrastructure. The government ran a tender to reveal the best contractors in the region to implement the President’s plan.


AGIP KCO KASHAGAN 70 METER RADIO TOWER FOR KARABATAN CAMP

There is an AGIP-KCO project for Kashagan Field Development onshore project. The Kashagan field is located in the Caspian Sea offshore Kazakhstan, approximately 80 km south of the town of Atyrau. The reservoir contains 45 API oil
with associated sour gas. The development will comprise a combination of both offshore and onshore processing facilities.