DESIGN AND PROCUREMENT OF TELECOMMUNICATION SYSTEMS FOR AGIP KCO, KASHAGAN

In the middle of 2011 AVENCOM signed a contract with Agip KCO which included providing detailed design, procurement, assembly, start up and adjustment of the following systems:

  • ACS;
  • LAN and telephone lines;
  • Fibre optic telecommunications lines
  • TETRA radio
  • PA/GA

KAZAKHMYS BOZSHAKOL SULPHIDE PROJECT

The Bozshakol Copper Project has been targeted for development to facilitate the long term production and supply of copper concentrate for the Balkash and Zhezkazgan smelters. The Kazakhmys smelters are presently under utilised by thirty percent and the onstream production of Bozshakol in 2014 will result in a significant increase of copper production; adding over 100 000 tonnes per annum into the overall copper cathode production capabilities.


METROETHERNET FOR KAZAKHMYS CORPORATION

Metro  Ethernet network was designed to combine the industrial areas of the metallurgical complex of Corporation Kazakhmys in two cities for the first, to ensure the rapid exchange of current information received from the automation systems and telemetry, and secondly to increase the capacity of the connection
as the Internet and the Intranet.


KPO EXPORT PIPELINE LONG HAUL DWDM

SDH STM-1 (0.156 Gbit/s) was the only system that used in KPO Export Pipeline Aksai – Bolshoi Chagan Pumping Station (BCPS) – Atyrau Terminal. It was used mainly for DCS purposes by SCADA system.


AGIP KCO KASHAGAN SAMAL CAMP

As part of the first phase of the development of the Kashagan oil field, called Experimental Program, a permanent camp Samal was constructed in Karabatan. AVENCOM subcontracted the construction of the following objects in Samal:

  • 70 m telecommunication tower erection for Page Europa SpA;
  • Installation of Electrical, fiber optic, instrumental cabling system in camp Samal for Almaty Kurylys;
  • Turn key installation of Entertainment System for Page Europa SpA.