PIPELINE CONDITION MONITORING & SURVEILLANCE SYSTEM EXPANSION OF KAZTRANSOIL ALIBEKMOLA – KENKIYAK – ZHANAZHOL CRUDE OIL PIPELINE

The scope of first phase of the project was commissioned in December 2009 on Oil Pipeline, Kenkyak MOPS – Zhanazhol MOPS section and consisted of one OptaSense interrogator unit, one processing and storage server and two operator workstations.


TENGIZCHEVROIL DATA TRANSMISSION SYSTEM FOR WAREHOUSE BARCODE PROJECT

In the implementation of this project the following problems were solved:

  • provision of a high rate on the radio channels;
  • coverage of the specified area;
  • possibility of simultaneously working with several clients;
  • possibility of filtering traffic and the provision of secure wireless access to controller devices;

DESIGN AND PROCUREMENT OF TELECOMMUNICATION SYSTEMS FOR AGIP KCO, KASHAGAN

In the middle of 2011 AVENCOM signed a contract with Agip KCO which included providing detailed design, procurement, assembly, start up and adjustment of the following systems:

  • ACS;
  • LAN and telephone lines;
  • Fibre optic telecommunications lines
  • TETRA radio
  • PA/GA

KAZAKHMYS BOZSHAKOL SULPHIDE PROJECT

The Bozshakol Copper Project has been targeted for development to facilitate the long term production and supply of copper concentrate for the Balkash and Zhezkazgan smelters. The Kazakhmys smelters are presently under utilised by thirty percent and the onstream production of Bozshakol in 2014 will result in a significant increase of copper production; adding over 100 000 tonnes per annum into the overall copper cathode production capabilities.


INSTALLING AND COMMISSIONING QINETIQ/OPTASENSE PIPELINE SECURITY SYSTEM ON THE EXPORT PIPELINE KARACHAGANAK-ATYRAU, PHASE III

For the protection of part of the export pipeline Karachaganak-Atyrau from unauthorised interruptions in its work, an OptaSense system, produced by the English company QinetiQ, was designed and installed.
The system was designed to discover, classify and determine the site of potential threats to the pipeline.


BAKU-TBILISI-CEYHAN PIPELINE. CONDITION MONITORING AND SURVEILLANCE SYSTEM OF TURKEY SECTION. PHASE II

Baku – Tbilisi - Ceyhan Pipeline is one of the longest in the world. OptaSense technology was selected for condition monitoring of Turkey segment. Operation of
just the first phase of the project, consisting of two interrogator units allowed to detect the illegal tapping attempt. Mr Hasan Alsancak BP-BTC Country Security Manager Turkey said “We have been impressed with the technical performance over the last year with this technology successfully preventing theft from our pipeline over the initial 100km. We believe the OptaSense system to be a cost effective way of monitoring the security and efficiency of our pipeline.


TECHNOPARK ALGORITM URALSK

The construction of the new Technopark Algoritm office was included into the RoK 2006 Development Program. It was planned to be a modern office with state-of-the-art equipment and infrastructure. The government ran a tender to reveal the best contractors in the region to implement the President’s plan.