DESIGN AND PROCUREMENT OF TELECOMMUNICATION SYSTEMS FOR AGIP KCO, KASHAGAN

In the middle of 2011 AVENCOM signed a contract with Agip KCO which included providing detailed design, procurement, assembly, start up and adjustment of the following systems:

  • ACS;
  • LAN and telephone lines;
  • Fibre optic telecommunications lines
  • TETRA radio
  • PA/GA

KAZAKHMYS BOZSHAKOL SULPHIDE PROJECT

The Bozshakol Copper Project has been targeted for development to facilitate the long term production and supply of copper concentrate for the Balkash and Zhezkazgan smelters. The Kazakhmys smelters are presently under utilised by thirty percent and the onstream production of Bozshakol in 2014 will result in a significant increase of copper production; adding over 100 000 tonnes per annum into the overall copper cathode production capabilities.


AGIP KCO KASHAGAN SAMAL CAMP

As part of the first phase of the development of the Kashagan oil field, called Experimental Program, a permanent camp Samal was constructed in Karabatan. AVENCOM subcontracted the construction of the following objects in Samal:

  • 70 m telecommunication tower erection for Page Europa SpA;
  • Installation of Electrical, fiber optic, instrumental cabling system in camp Samal for Almaty Kurylys;
  • Turn key installation of Entertainment System for Page Europa SpA.

AGIP KCO KASHAGAN KARABATAN PERMANENT CAMP ENTERTAINMENT SYSTEM

Scope of this project was to design and install the Entertainment System and its associated equipment for Early Works Permanent Camp in Kashagan Area.