“INTERGAS CENTRAL ASIA” JSC. MODERNIZATION OF THE CORPORATE COMMUNICATIONS NETWORK

Scope of workProject description
  • Procurement of equipment;
  • Installation, start-up and adjustment;
  • Тesting and commissioning.

Products Used:

  • Uniflair (Italy)

 

Installation of the first air-conditioner: JSC «Intergas Central Asia» decided to fit out the server room with an independent cooling system to maintain a stable
temperature.
AVENCOM specialists proposed modern precision equipment to JSC «ICA», having taken into account the higher temperature readings in summer. This equipment uses a Freon, which doesn't contain components that breakdown ozone, and so is in accord with the Kyoto Protocol.
Installation, start-up and adjustment was carried outin a short time and the equipment was started in a 24/365 regime. Installation of the second air-conditioner: In time, JSC «Intergas Central Asia» increased the area of the server room, and the amount of the equipment there, and so it was necessary to fit out the premises with a
second precision air-conditioner. AVENCOM used a unit from Uniflair's Amico series to increase the area that was cooled. Installation, start-up and adjustment was carried out in a short time and the equipment was
started in a 24/365 regime. For convenient maintenance and monitoring, both conditioners were
connected to the local network for remote control...

Project statistics

Location:WКО,Uralsk
Customer:JSC «Intergas Central Asia»
Total value:USD 54,224
Incidents:0
Time elapse:2012 - 2013
Duration:10 months
Handover:2012 - 2013