HVAC AUTOMATION FOR ZHAIKMUNAI CHINAREVO

Scope of workProject description
  • Development of a technical solution;
  • Detailed design;
  • Procurement of equipment;
  • Installation, start-up and adjustment;
  • Тesting and commissioning.

Products Used:

  • Аrktika (Russia)
  • Regin (Sweden)
  • Polar bear (Sweden)

Automatic control of the supply-extract system was installed and adjusted in 4 buildings of the Chinareva OGCF. The system was set up taking into account
possible gas leaks and fires. The supply-extract system under automatic control provides:

  • Control and regulation of air supply;
  • Protection of a water heater from freezing;
  • Control of the start up of ventilation;
  • Air valve control;
  • Control of an adjusting valve on the heat carrier;
  • Control of the work of the circulation pump;
  • Regulation of the temperature in the premises.

Special features of the project:

  • Automatic switching on of back up ventilation units.
  • The workings of sensors and motors to not trigger explosions.

Project statistics

Location:West Kazakhstan
Customer:LLP «Agroremash»
Project Cost:USD 62,082
Incidents:0
Time elapse:3 months
Delivery:December 2010