AGIP KCO BAUTINO BASE HVAC SYSTEM

Scope of workProject description

Delivery and turnkey installation of HVAC system

Used product:

  • Liebert-Hiross, Pyrox

It was necessary to propose HVAC system for two external electrical units on the site of treatment facilities of drilling sludge and reduced crude water on AGIP KCO Base at Bautino village in Mangystau Region of Kazakhstan.
Thevolumes of the facilities are 200 cubic meters each.After careful analysis of the operating conditions of the system, AVENCOM’s specialists came to the conclusion that it is necessary to use precision air-conditioners instead of split-system type. The company has proposed a system based on Liebert-Hiross products.
Despite the cost of the solution the Customer was impressed by the performance and reliability of the suggested HVAC.

The installation, testing and commissioning of the equipment andmaterials weremade in short terms – three weeks. The solution proposed by AVENCOM in practice proved its efficiency and professionalism.

Project statistics

Location:AGIP KCO Base, Bautino village, Mangystau Region, Kazakhstan
Customer:AGIP KCO
Total value:KZT 16 000 000.00
Incidents:0
Time elapse:5 months
Delivery:2007