AGIP KCO KASHAGAN SAMAL CAMP

Scope of workProject description

70 meter telecom tower erection:

  • Factory Acceptance Test;
  • Supervision for  Foundation construction;
  • Tower delivery;
  • Tower assembling and erection;
  • Earthing and Lightning Protection.

Entertainment ystem:

  • Functional Design of the system;
  • Purchase and Delivery;
  • Installation and Staging in AVENCOM office in Uralsk;
  • Transportation and commissioning in Samal Camp.

Samal Camp Cabling System:

  • Excavation;
  • Fiber optic and electrical cable installation and  grounding;
  • Fiber optic cable OTDR tests;
  • Electrical cables tests;
  • Termination in blocks;
  • Lighting system installation.
 

As part of the first phase of the development of the Kashagan oil field, called Experimental Program, a permanent camp Samal was constructed in Karabatan. AVENCOM subcontracted the construction of the following objects in Samal:

  • 70 m telecommunication tower erection for Page Europa SpA;
  • Installation of Electrical, fiber optic, instrumental cabling system in camp Samal for Almaty Kurylys;
  • Turn key installation of Entertainment System for Page Europa SpA.

The tower was designed to resist extreme wind gusts of up to 48 m/s and harsh weather conditions in the area. It is equipped with six antenna rest/work platforms and an Instrument and Telecommunication Shelter. The four sided lattice self-supporting construction was manufactured at EMTAMITAS Plant (Ankara, Turkey) and delivered to the construction site where it was assembled and erected on site by a team of six qualified erectors with a 25 m crane and a tractor for lifting.

The Camp Entertainment System was composed of 4 dish antennas,30 IRD’s and 34 UHF modulators (30 for IRD’s, the other four for signals coming from Customer provided equipment);a network distribution system composed of Fiber Optic TXs and RXs, combiners and amplifiers distributed the signal in various buildings in the Camp.

All indoor equipment was installed in 6 of 42’ rack unit cabinets 800X800 mm. The FAT was organized in AVENCOM’s staging facilities. After the test the assembled cabinets were delivered to the destination.

Project statistics

Location:Karabatan, West Kazakhstan
Customer:Page Europa S.p.a, Almaty Kurylys
Total value:EUR 618 000
Incidents:0
Time elapse:15 months
Delivery:2005-2006

22 882+

Engineering