WIRELESS TRANSPORT SYSTEM FOR ELECTRONIC GOVERNMENT

Electronic Document Circulation (EDC) system was designed to connect all the departments of the government of West Kazakhstan region into one computer based network. Each department is equipped with a server responsible for collecting, storing and distributing of documents.


TECHNOPARK ALGORITM URALSK

The construction of the new Technopark Algoritm office was included into the RoK 2006 Development Program. It was planned to be a modern office with state-of-the-art equipment and infrastructure. The government ran a tender to reveal the best contractors in the region to implement the President’s plan.


KPO EXPORT PIPELINE LONG HAUL DWDM

SDH STM-1 (0.156 Gbit/s) was the only system that used in KPO Export Pipeline Aksai – Bolshoi Chagan Pumping Station (BCPS) – Atyrau Terminal. It was used mainly for DCS purposes by SCADA system.


KPO BV KARACHAGANAK HVAC MAINTENANCE

When the partners in Karachaganak Petroleum Operating B.V. (KPO) – BG Group, Eni, ChevronTexaco and LUKOIL – signed the 40-year Final Production Sharing Agreement with the Government of Kazakhstan in November 1997, a commitment was given to construct new facilities that would allow the Karachaganak oil to enter world markets.


AGIP KCO KASHAGAN SAMAL CAMP

As part of the first phase of the development of the Kashagan oil field, called Experimental Program, a permanent camp Samal was constructed in Karabatan. AVENCOM subcontracted the construction of the following objects in Samal:

  • 70 m telecommunication tower erection for Page Europa SpA;
  • Installation of Electrical, fiber optic, instrumental cabling system in camp Samal for Almaty Kurylys;
  • Turn key installation of Entertainment System for Page Europa SpA.

AGIP KCO KASHAGAN 70 METER RADIO TOWER FOR KARABATAN CAMP

There is an AGIP-KCO project for Kashagan Field Development onshore project. The Kashagan field is located in the Caspian Sea offshore Kazakhstan, approximately 80 km south of the town of Atyrau. The reservoir contains 45 API oil
with associated sour gas. The development will comprise a combination of both offshore and onshore processing facilities.


AGIP KCO KASHAGAN KARABATAN PERMANENT CAMP ENTERTAINMENT SYSTEM

Scope of this project was to design and install the Entertainment System and its associated equipment for Early Works Permanent Camp in Kashagan Area.